Rescue boat update:
Monday, pulled deck off, completed new interior patterns, pulled carpets, removed all cables, wiring, drill a dozen 2" holes through flooring to inspect foam...ALL DRY... This is a first, actually boat was over foamed in the back, found voids in the middle, and the floor where the "L"seat sets was bowed down 1.25" in the center. Cut out the stressed forward center floor & decided to add a new bulkhead to support, will resume on Wed.
Stressed flooring was .25" 6lb. foam core with 40oz wr on the bottom, 48oz wr & gelcoat on the top, a very heavy laminate schedule, but should have had a .5" foam core (started using .5" in 1996 models)
Will have a complete slide show available for the reunion if interested.