Hi everybody. Its been a long time since i posted an update, but things have been getting done. The floors have been done for about 3 weeks now. Once all the pieces were cut, i coated the bottoms and the edges with epoxy. I cut out the ski pylon hole, and the holes behind the foot rest, and coated the inside of those with epoxy. I replaced the wood support piece that is in front of the ski pylon, and put the foam stop in? Not sure what its called, but it goes in between the stringers. Then i screwed the floor into the stringers with SS screws. After that i packed fillet in the gap between the hull and floor. I fiberglassed the side to the hull, then finished everything with a layer of fiberglass on the top. The day after this got done, i got on a plane and left to go up north for a month. While i was gone, my dad started to tear apart the engine. He separated the bellhousing from the block to get it on a stand. There is a small exhaust leak on the starboard side, so he got the exhaust manifold off to put a new gasket on and replace the bolts. Two bolts broke off, but they came out very easily with PB blaster and a pair of vice grips. That's where it is right now. I ordered a flex plate from Ron, it came very quick and looks nice. Thanks. Not amskier, but earlier in the thread i mentioned i was building a boat, that is also done. Here are some pics Sorry for the bad floor pics